Welcome to the East of Liaoning East Electric Co., Ltd. official website!
Liaoning dongdadongre electricity co.,ltd

News Categories

Product Categories

Contact Us

Liaoning Dongdadongre Electricity Co.,Ltd

Address:Northeastern university in shenyang 128 mailbox

Postalcode:110004

Tel:13940365891

Phone:024-23991026   024-23995486 

Fax:024-23913210

Website:www.dddq.com

E-mail:dddq@dddq.com

The wind curtain machine installation method correctly use maintenance guide

Your current location: Home >> News >> Technology center

The wind curtain machine installation method correctly use maintenance guide

Date:2016-03-01 00:00 Source:http://www.dddq.com Click:

Steam air curtain

 

The wind curtain machine (steam air curtain machine, hot air curtain) what methods to use? Users buy the wind curtain machine, it is important to how to correctly use and maintenance problems. Wind curtain machine products on both sides of the main role is isolated from air convection, at the same time preventing small flying insects, flies fly, average wind curtain machine is installed on the frame, from above to blow, air curtain. Air curtain machine in use process according to the different environment, temperature, choose different windshield.

The wind curtain machine installation method

A, air curtain machine installation requirements

1. The machine should be installed on the door frame

2. The slot width must be less than or equal to the length of air curtain; (if it was too wide to connect several curtain machine installation).

3. Install the bottom must be solid coupling (or post) on the wall to prevent vibration caused by loose.

Second, the wind curtain machine installation method

Install the floor installation method:

Such as: installed in the concrete wall. According to the arrangement of the location of the installation hole on the floor, eight bolts M10 x 60 the relative size of the position, the bolt embedded in cement. Then install base plate is fixed on it. Or directly in the concrete wall punching, use of expansion bolts.

1. Stay mortar in fixed fully, fix the mounting plate washer nut bolt, 8 bolts on the concrete wall or door frame;

2. The body kakari must be inserted on the mounting plate mounting holes.

Three, air curtain machine use and maintenance

The keys of the machine (1) the wind curtain machine switch, a power on and off, the other two control speed, etc.the machine has two gears;

In order to keep indoor temperature, when using, please open a low gear.

The smell and moth-proofing, etc., using open top gear, please.

(2) the wind curtain machine adjustment plate in the direction of the wind

When indoor heating, turn the wind deflector, tuyere outward;

When indoor cooling, turn the wind deflector, tuyere inward;

When using dustproof, moth-proofing, anti odor of rotational wind deflector, outlet to the outside.

(3) the wind curtain machine maintenance

1. To check, should cut off the power before cleaning the machine;

2. With a soft cloth with cleaner wet, cleaning the wind hundred shutters, wind curtain blade and casing;

3. Cleaning blade, soft hard, otherwise will cause deformation and vibration.

Related Tags:Aircurtain

Recently viewed:

Share
Welcome to our message
Please enter the message, we will contact you soon.
Name
Contact
Phone
Phone / mobile number